Title: The 5th Annual Conference on Total Building Commissioning 2009
1The 5th Annual Conference onTotal Building
Commissioning2009
Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC
- Commissioning Changes in LEED 2009
2Morning Warm-up
- TRUE/FALSE?
- According to ASHRAE, energy modeling is meant to
predict the energy use of a building? - False
3Morning Warm-up
- True/False?
- The typical model of operating buildings is
sustainable. Investments (from energy companies,
or otherwise) in this model will be sustained.
4Morning Warm-up
- True/False?
- Commissioning filled a gap in the design and
construction process by which an operable
building is turned over to an owner.
5Morning Warm-up
- True/False?
- A gap still exists between what a new building
controls system is capable of doing versus what
is utilized.
6LEED 2009
- When?
- What is new and different?
- What does it mean to you Cx Agent?
7USGBCs Mission
Promote the design and construction of buildings
that are environmentally responsible, profitable,
and healthy places to live, work and learn.
The organizations activities Integrate building
industry sectors Lead market transformation Educat
e owners and practitioners
8(No Transcript)
9New and Different
10New and Different
11New and Different
- Prerequisites and credits in the LEED 2009
addresses 7 topics - Sustainable Sites (SS)
- Water Efficiency (WE)
- Energy and Atmosphere (EA)
- Materials and Resources (MR)
- Indoor Environmental Quality (IEQ)
- Innovation in Design (ID)
- Regional Priority (RP)
12New and Different
- LEED 2009 certifications are awarded according to
the following scale - Certified 4049 points
- Silver 5059 points
- Gold 6079 points
- Platinum 80 points and above
- Out of 100 total points (with 10 bonus points
available)
13New and Different
- Harmonized Bookshelf Approach
- Changes to Credit Weightings
- Regionalization
- LEED Online
- Green Building Certification Institute (GBCI)
14What does it mean to you?
- LEED-NC v2.2 Commissioning
- LEED 2009 NC - Commissioning
- LEED-EB v2.0 Retro-Commissioning
- LEED 2009 EB
15LEED-NC Commissioning
- Intent Verify that the building energy systems
are installed, calibrated and perform according
to the owners project requirements (OPR), basis
of design (BOD), and construction documents. - HVACR systems and controls
- Lighting and daylighting controls
- Domestic hot water systems
- Renewable energy systems (wind, solar, etc.)
16LEED-NC Commissioning Changes for 2009
- 2 points for EA Credit 3 Enhanced Commissioning
instead of 1 point - Innovation point possible for Envelope
Commissioning
17LEED-NC Commissioning Changes for 2009
- The same CxA overseeing the enhanced
commissioning tasks must also oversee the
fundamental commissioning tasks. Table 2, note
4, pg. 221. - See also Who Can Be the Commissioning
Authority? 01/03/06 LEED 2.2 Commissioning
Subcommittee, posted under LEED Reference
Documents, http//www.usgbc.org
18LEED-EB Retro-Cx (old version)
- Intent Verify that fundamental building systems
and assemblies are performing as intended to meet
current needs and sustainability requirements. -
- Building Operation Plan means for execution
19LEED-EB Retro-Cx
- Requirements Verify installation, calibration,
and operation for functionality and efficiency of
the following - Heating, cooling, and humidity control
- Lighting
- Safety
- Controls
20LEED-EB Retro-Cx
- Building Operation Plan components
- Use occupancy and schedule by space type
- Static system requirements
- Functional system requirements
21LEED-EB Retro-Cx
- Performance Testing Plan (Cx Plan) components
- Part A - Inspection
- Part B Functional Verification (data logging)
22LEED-EB Retro-Cx
- Building Envelope
- HVAC
- Water
- Lighting
- Controls
23LEED 2009 for Existing Buildings Operations
Maintenance
- LEED-EB for OM (short life-span)
- LEED 2009 for EB OM
- EA Prerequisite 1 Energy Efficiency Best
Management Practices Planning, Documentation,
and Opportunity Assessment - EA Credit 2.1 Existing Building Commissioning
Investigation and Analysis - EA Credit 2.2 Existing Building Commissioning -
Implementation
24LEED Green Building Operations and Maintenance
2009
- EA Credit 2.3 Existing Building Commissioning
Ongoing Commissioning
25EA Prerequisite 1 Energy Efficiency Best
Management Practices
- Document sequence of operations
- Develop a Building Operations Plan
- Occupancy Schedule
- Equipment Run-Time Schedule
- Design setpoints for HVAC equipment
- Design lighting levels throughout the building
- Validate that the BOP is met during performance
period
26EA Prerequisite 1 Energy Efficiency Best
Management Practices
- Develop a systems narrative for mechanical and
electrical systems - Create a narrative of the preventative
maintenance plan with scheduled maintenance - Conduct an ASHRAE Level I walk-through assessment
- 2007 ASHRAE Handbook HVAC Applications
- ASHRAE Procedures of Commercial Building Energy
Audits
27EA Credit 2.1 Existing Building Cx
Investigation and Analysis
- Option 1. Commissioning Process
- Develop RCx Plan
- Implement RCx Plan
- Document breakdown of energy use
- List operating problems and potential solutions
- Identify capital improvements with cost-benefit
analysis
28EA Credit 2.1 Existing Building Cx
Investigation and Analysis
- Option 2. ASHRAE Level II Energy Audit
- Conduct an energy audit
- Implement RCx Plan
- Document breakdown of energy use
- Perform savings and cost analysis of all
practical measures - Identify capital improvements with cost-benefit
analysis
29EA Credit 2.2 Existing Building Commissioning -
Implementation
- Implement no- or low-cost operational
improvements. - Create a capital plan for major upgrades
- Provide training
- Demonstrate financial costs and benefits of
implemented measures - Update BOP to reflect changes
30EA Credit 2.3 Existing Building Commissioning
Ongoing Cx
- Implement an ongoing Cx program that addresses
- Planning, testing, corrective action, on-going
measurement - Document ongoing commissioning cycle (24 months
or less) - Complete ½ of the scope prior to submission
- Update BOP or systems narrative as necessary
31LEED 2009 for EB OM - Implementation
- Performance Period
- 3 consecutive months minimum most credits
- 1 year minimum EA Prereq 2 and Credit 1
- Not more than 24 months any credit
- Terminate within 1 week all credits
- Pay attention to detail
- Tie-in with other LEED Credits
- All WE Prerequisites and Credits
- All EA Prerequisites and Credits
- IEQ Prereq 1, Credits 1.x, 2.x
32Questions and Answers Thank You!